Technical Aspects of Closure: Physical and Chemical Stability
Publication - PresentationThis presentation was delivered as part of the 2022 Mine Closure workshop by SRK Consulting Kazakhstan.
Learn More
This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
This presentation was delivered as part of the 2022 Mine Closure workshop by SRK Consulting Kazakhstan.
Learn MoreSRK undertook a site selection study and technology options assessment to develop the future TSF.
Learn MoreSRK conducted a hydrogeological characterization of the Juanicipio mine to understand the origin and means of transport of the water that flows in the mining works, so that the mine could determine if the dewatering capacity currently installed is adequate or if it would be necessary to improve it to prevent a flooding event.
Learn MoreWhen it comes to dewatering and depressurisation at operational mine sites, getting the technical understanding right is only half the story.
Learn MoreMaximise your project's potential with our unique cave mining design and optimization strategies
Learn MorePost-closure maintenance activities for various inactive copper tailings impoundments owned by BHP in Arizona (USA) require frequent erosion-related inspections and repairs.
Learn MorePermitting process of Siguiri Gold Mine to meet the requirements of the relevant legislation in Guinea.
Learn MoreDive into the assessment of static liquefaction triggering in tailings dams and understand the role that the soil water characteristic curve (SWCC) plays.
Learn MoreSRK realised optimisations through value engineering as part of the Stage 3 TSF embankment raise design for the Gruyere Gold Mine.
Learn More