Search

Design of TSF Embankment Raise for Gruyere Joint Venture

Gruyere Gold Mine

Project - Western Australia

SRK realised optimisations through value engineering as part of the Stage 3 TSF embankment raise design for the Gruyere Gold Mine.

Learn More

How An Integrated Approach To Geological Mapping Provided New Insights To The Klondike Gold District

Matthew Grimshaw - June 2019

Publication

Geological mapping is a key part of any mineral exploration project and provides vital insights into the lithological and structural controls of mineralisation.

Learn More

An Analysis Of A Detailed Engineering Study In Accordance With IESO IAP Requirements

Nathan Wineinger - May 2019

Publication - Presentation, Published Paper

This study included the completion of a full mine ventilation survey as well as the measurement of a full suite of electrical parameters of the surface and underground ventilation fans.

Learn More

Impact of Changes in Water Use Policy and Legislation on Mine Waste Water Management Infrastructure – a Case Study of In-Line Attenuation Ponds

Priscilla Garvey, Whelan Naidoo - October 2018

Publication - Published Paper

South Africa is an arid country currently experiencing a drought. Consequently, protection of water resources and responsible water use in all sectors, including the mining industry, has been prioritised.

Learn More

Mining Dilution: Variable Versus Fixed Factor

Anoush Ebrahimi - February 2018

Publication - Presentation

Mining dilution affects the economy of mining projects in many ways. Investigate the difference of using variable versus fixed factors in this case study.

Learn More

Pit Lake Water Quality Modelling at Century Mine

Claire Linklater, Alex Watson, Alison Hendry, John Chapman, J Crosbie, P Defferrard - November 2017

Publication - Published Paper

The Century open cut zinc mine at Lawn Hill undertook closure planning for the site which was initiated by Zinifex, developed further by MMG, and is continuing under new ownership.

Learn More

Trends in the Evolution of Particle Morphology with Size in Colluvial Deposits Overlying Channel Iron Deposits

Sandra Linero, Arcesio Lizcano, Stephen Fityus, John Simmons, Jessica Cassidy - July 2017

Publication - Published Paper

Size limitations of testing equipment often imply that samples of coarse granular materials must be scalped or scaled, to reduce the size of the constitutive particles, before they can be tested either by triaxial or direct shear in the laboratory.

Learn More

Expert Witness - Mining Due Diligence

Andrew van Zyl, Simon Hanrahan, John Pfahl - September 2017

Publication - Article

In this interview with Lawyer Monthly magazine, SRK experts from around the globe offer their insights into mining due diligence.

Learn More

Geochemical Predictions of Metal Leaching and Acid Generation: Geologic Controls and Baseline Assessment

Rob Bowell, Jeff Parshley, S. B. Rees, Jeff Parshley - January 2000

Publication - Published Paper

An essential component in the evaluation of a mineral deposit or a mine development project is the consideration of environmental impact, particularly the leaching of deleterious elements such as As and many of the transition metals or of Acid Rock Drainage (ARD) generation.

Learn More

Dynamically Representing Tailings Pool Geometry - GoldSim Webinar Presentation

David Hoekstra - June 2017

Publication - Presentation

When developing a water balance of the pool on top of conventional tailings storage facilities, simulating the geometry of the pool can be a particularly difficult task given the highly dynamic nature of the pool shape.

Learn More