Search

New Closure Guidance Published by ICMM: Planning for Integrated Mine Closure

Dawn Garcia - January 2010

Publication - Article

The International Council on Mining & Metals (ICMM) has followed up the August 2008 publication, Planning for Integrated Mine Closure, with a Spanish-language version, which was published in a web-based format in September 2009.

Learn More

Arturo Pérez

Consultant - Denver, USA

Arturo Pérez has over 14 years of experience in hydrogeology for mining projects.

Learn More

Tailings and Mine Waste 2024

Event - Colorado, USA

We are a proud Platinum Sponsor and Exhibitor at The Tailings and Mine Waste Conference this year.

Learn More

Frieda River Copper-Gold

Tailings and Hydroelectric Power Study

Project - Papua New Guinea

Selection phase design of integrated hydroelectric power, mine waste rock, and process TSF.

Learn More

Buriticá Mine

Buriticá Dry Stack Tailings Storage Facility

Project - Buriticá, Antioquia, Colombia

SRK has been providing support since 2015 for the mine plan, geotechnical stability evaluations, geologic-seismic and hydrologic hazards and currently providing engineer of record, operations and construction support.

Learn More

Taking a Strategic Approach to Mine Decarbonisation

Philippa Burmeister - September 2022

Publication - Article

With growing stakeholder expectations for the mining sector to reduce its carbon footprint, current industry efforts are uncovering a range of practical opportunities to decarbonise at operational level.

Learn More

ACG Mine Closure 2023 Conference

Event - Sparks, NV, USA

SRK is a platinum sponsor and exhibitor at ACG's Mine Closure 2023 event. Meet with our closure and environmental specialists at Booths #702 & 704.

Learn More

ACG Mine Closure 2024 Conference

Event - Perth, Western Australia

SRK is a major sponsor and exhibitor at ACG's Mine Closure 2024 event. Meet with our closure and environmental specialists at Booth #19.

Learn More

Case Study: Weak Rock Open Pit Slope Stability Evaluating the Position of Permanent Mine Infrastructure

Edward Saunders, Andrew LeRiche - August 2021

Publication - Presentation, Published Paper

This co-authored case study by Ed Saunders and Andrew LeRiche is based on a northern Canadian mine. It evaluates the permanent position of mine infrastructure with consideration to geotechnical design, weak rocks, and open pit slope stability.

Learn More

Direct Extraction Lithium Processes: The Challenges of Spent Brine Disposal

Ignacio Ezama, Camilo Raúl de los Hoyos, Terry Braun - October 2018

Publication - Published Paper

The significant role of lithium in the continued development and expansion of renewable and clean energy has led to an increase in the demand for projects involving the extraction of lithium from shallow brines, particularly in the ‘lithium triangle’.

Learn More