Mauro Tailings Dam Tunnels
Geotechnical and Engineering Design
Project - ChileProduced designs, technical specifications, and cost estimates for 4 tunnels from 2.4 to 3.5 km long
Learn More
This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
Geotechnical and Engineering Design
Project - ChileProduced designs, technical specifications, and cost estimates for 4 tunnels from 2.4 to 3.5 km long
Learn MoreAdriaan Meintjes - March 2019
Publication - ArticleIn his third article on tailings storage facilities, Adriaan Meintjes looks at how technology can address the challenges.
Learn MoreJohn Kurylo, Kendell Cator, Maritz Rykaart, Cameron Hore - October 2018
Publication - ArticleThe tailings management system for the Hope Bay Project, in Nunavut, Canada, includes sub-aerial tailings deposition into the Doris tailings impoundment area (Doris TIA).
Learn MoreMegan Miller, Maritz Rykaart - October 2016
Publication - ArticleAs part of the tailings management system for the Doris Project in Nunavut Canada, a frozen core dam was constructed in 2012 on a foundation of thick ice-rich, saline glacial marine silt and clay, and fine sand.
Learn MoreSRK Global - July 2015
PublicationFrom 2010 to 2015, SRK undertook the feasibility, detail design and construction supervision of the Tap D in-pit tailings facility for the Tucano gold project in Brazil.
Learn MoreVladimir Ugorets, Vladimir Ugorets, Dmitry Yermakov - January 2013
PublicationIn situ leaching (ISL), also known as in situ recovery, is a low capital-cost method of extracting uranium, copper or potash from suitable deposits
Learn MoreLinda Spies - February 2020
Publication - PresentationAlthough there are many environmental benefits to the inclusion of a liner in a tailings dam, this does increase the complexity of the design, construction and operation of the tailings dam.
Learn MoreAndrew van Zyl, Lyzandra Boshoff, Lisl Fair - May 2020
Publication - Article"Consulting engineers and scientist SRK Consulting is rolling out automated vibrating wire piezometers (VWPs) on tailings facilities", says SRK Consulting principal engineering geologist Lyzandra Boshoff.
Learn MoreIgnacio García Schmidt, Erik Ketilson, and Darryl Godley - November 2020
Publication - ArticleIn conjunction with RST Instruments, SRK has developed a new, cost-effective system to trigger an alarm at the onset of an earthen dam breach and warn the population in the flood area when a dam shows signs of failing.
Learn MoreJamie Spiers - May 2021
Publication - ArticleAdvances in tailings dewatering technologies (such as pressure filtration) has led to an expansion in options for safe and efficient storage of tailings in arctic environments.
Learn More