WTC2022 | Accessibility, Circulation & Evacuation Plan: Phase 1, Stage I&II. Buenos Aires Metro, Argentina

 

Technical Talk

Date: Wednesday September 7

Time: 2:00 PM

Place: Track4 - Room Wed6 | Occupational Health and Safety 1

Title: Accessibility, Circulation & Evacuation Plan: Phase 1, Stage I&II. Buenos Aires Metro, Argentina

Authors: Jorge Laiun, Pedro Fernández

 

Abstract

The Buenos Aires Metro consist of six lines -A, B, C, D, E and H- that extend approximately 63 km underground and have 90 operational stations. The subway authorities decided to increase the interconnection capacity between lines B, C and D.

This paper focuses on stages I and II of the first phase of the extension program, which involve: the construction of a shallow tunnel on soft soil that connects the stations of lines C and D, both located at the center of the city; and the construction of an access building that overlies the line C station and aims to interconnect the three lines stations at surface.

The details of the project, it's interaction with the existing tunnels and the as-built configuration of the structures are presented and discussed.

Click here to view other presentations at this event