Project Management

Project Management for Construction of 140 km Railway Linen

In January 2012, Vale, one of the worlds premier mining companies, appointed SRK as the project management consultants and engineer under the FIDIC conditions of contract for the Nacala Corridor Railway Project Section 3 in Malawi. Section 3 involved construction of a 140 km railway line through virgin ground. Section 5 in Malawi was added in mid-2013 and involved rehabilitation of 100 km of existing railway line.

SRK was responsible for health and safety, scheduling, monitoring quality and costs during the construction phase, documentation, social and environmental management, and elements of re-design.