This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
Khotgor Shanaga LLC (the Client or the Company) commissioned SRK to provide technical services including exploration design, exploration management, resource estimation and JORC Resource Reporting on their Nuurst Khotgor Coal Mine located in Uvs Aimag (Province) in western Mongolia.
The tenement area is about 1,400 km west of Ulaanbaatar, the capital of Mongolia; 90 km from Ulaangom, the capital of Uvs Aimag, and 40 km from Bukhmurun Soum, the local administrative centre. The purpose of this Report was to provide an independent resource estimate in accordance with JORC Code. This Report has been prepared to the standard of and is considered by SRK to be a Technical Assessment Report under the guidelines of the VALMIN Code which incorporates the JORC Code for the reporting of Exploration Data, Mineral Resources and Reserves.
SRK conducted site visits and reviewed the geological reports related to the project, including the sampling and assaying methods being adopted, borehole locations, the original geological borehole logs and evaluations undertaken for the resource category, and methods used for the resource calculation as well as review of the depletion of the resource.
SRK provided a technical memo with recommendations on the exploration plan for the drilling program in 2012; and exploration design and Standard Operating Procedure (SOP) for exploratory drilling program, established database and completion of data verification and validation. SRK also developed a 3D geological model of the deposit; and resource estimate under the guidelines of the JORC Code.