Integrated Environmental Impact Assessment (EIA) Process for Anglo American Platinum – Rustenburg Platinum Mines Limited’s Der Brochen Mine Amendment Project, Limpopo

Short Project Title

Der Brochen Mine Amendment Project

Project Title

Integrated Environmental Impact Assessment (EIA) Process for Anglo American Platinum – Rustenburg Platinum Mines Limited’s Der Brochen Mine Amendment Project, Limpopo

SRK Project Reference Number

533247

SRK Project Manager

Selma Nel

Contact Person

Selma Nel

Contact Email

Snel@srk.co.za

Contact Number

011 441 1127

Der Brochen Mine Amendment Project

PROJECT SYNOPSIS

The Der Brochen Mine is a platinum project owned by Rustenburg Platinum Mines Limited (RPM), a wholly owned subsidiary of Anglo American Platinum (AAP). It is the intention of RPM to amend the Der Brochen Mine’s approved Environmental Management Programme (EMPr) and associated Environmental Authorisation (EA) as well as updating their existing Water Use Licence (WUL) to include the following:

  • The development of a buttress wall at the existing Helena Tailing Storage Facility (TSF) as well as the development of an additional filter press plant at the existing Mototolo Concentrator Plant, under emergency circumstances, as agreed by the Department of Mineral Resources (DMR) in October 2017;
  • The updated topsoil management plan of the Der Brochen Mine; and
  • The development and operation of the additional mining related infrastructure as part of the mine’s development strategy.

PROJECT LOCATION

The Der Brochen Mine is located approximately 25 km south-west of the town of Steelpoort and 40 km west of Mashishing (Lydenburg), in the Limpopo Province.
The Der Brochen Amendment Project and associated proposed project related infrastructure will be located on the following farms:

  • Helena 6 JT – Remaining Extent and Portion 3;
  • Der Brochen 7 JT – Remaining Extent;
  • Mareesburg 8 JT – Portion 1 and Portion 7.

STATUS OF PROJECT

Before RPM may commence with the development of the additional mining related activities, the following environmental authorisations processes and licence amendment need to be undertaken in accordance with the relevant national legislation:

  • A Scoping and Environmental Impact Assessment (EIA) for any project related Listed Activities stipulated in the National Environmental Management Act (Act No. 107 of 1998) (NEMA) and the National Environmental Management: Waste Act (Act No. 59 of 2008) (NEM:WA). The Der Brochen Mine’s existing EMPr will be amended in terms of the Mineral and Petroleum Resources Development Act (Act No. 28 of 2002) (MPRDA). The Scoping, EIA and amended EMPr will be submitted to Limpopo Province’s DMR for approval; and
  • An updated Integrated Water Use Licence (IWUL) for any project related water uses and accompanying Integrated Water and Waste Management Plan (IWWMP) under the National Water Act (Act No. 36 of 1998) (NWA), for submission and approval from the Department of Water and Sanitation (DWS).

The Scoping Report is now available for public review. All stakeholders are encouraged to comment on the Scoping Report by Monday, 04 March 2019, as your comments and suggestions on any aspect of the project will ultimately assist the relevant authorities to make an informed decision.

You are welcome to comment on the Scoping Report by:

  • Completing the Registration and Comment Form and submitting it to the SRK Stakeholder Engagement Office;
  • Writing a letter or additional written submission my mail, email, or fax;
  • Attending stakeholder meetings, details of which will be communicated to registered I&APs; and / or
  • Contacting the Stakeholder Engagement Office: 
    Ms Aphiwe-Zona Dotwana
    Stakeholder Engagement Office
    SRK Consulting, P. O. Box 55291, Northlands, 2116
    Tel: (011) 441 6105
    Fax: 086 503 6825
    E-mail: adotwana@srk.co.za

 


Documents

Reports

Documents
File Size
Date
 
533247 Der Brochen Amendment Public Announceent BID English Final
1540 KB
August 2021
533247 Der Brochen Amendment Public Announceent BID Sepedi Final
1826 KB
August 2021
533247 Der Brochen Amendment Public Announcement IAP Registration and Comment Form English Final
115 KB
August 2021
533247 Der Brochen Amendment Public Announcement IAP Registration and Comment Form Sepedi Final
321 KB
August 2021

Draft Scoping Report & Appendices

Draft Scoping Report & Appendices

Documents
File Size
Date
 
533247 Der Brochen Amendment Draft Scoping Report
3250 KB
August 2021
533247 Der Brochen Amendment Draft Scoping Report Appendices
6852 KB
August 2021

Draft EIA/EMPr Report & Appendices

Reports

Documents
File Size
Date
 
5332457 Der Brochen Amendment Draft for public review Part A EIA
7829 KB
August 2021
5332457 Der Brochen Amendment Draft for public review Part B EMPr
1963 KB
August 2021

Appendix A_Authority Correspondence

Documents
File Size
Date
 
Appendix A1 DMR Correspondence filter press and buttress wall 20171003
230 KB
August 2021
Appendix A2 Acceptance Letter from DMR Scoping Report 20190531
547 KB
August 2021
Appendix A3 Proof of submission of WULA application to DWS
134 KB
August 2021

Appendix B_EAP CV and Qualification

Documents
File Size
Date
 
Appendix B1 SRKZA JNB LakeF Jan 2019
154 KB
August 2021
Appendix B2 SRKZA JNB NelS Jan 2019
343 KB
August 2021
Appendix B3 Selma MA Degree
67 KB
August 2021
Appendix B4 SRKZA JNB RetiefE Jan 2019 docx QR
349 KB
August 2021
Appendix B5 Estie MA Degree
247 KB
August 2021
Appendix B6 NeluvhalaniThumo CV Oct 2018
288 KB
August 2021
Appendix B7 Thumo MA Degree
73 KB
August 2021

Appendix C_Proof of Public Participation

Documents
File Size
Date
 
Appendix C1_1 Samancor Owner Letter of Consent - Mareesburg 8 JT Ptn 1
189 KB
August 2021
Appendix C1_2 Lions Head Leasee Letter of Consent - Mareesburg 8 JT Ptn 1
967 KB
August 2021
Appendix C2_1 DMR Pre-Application Meeting_Attendance Register 20181210
109 KB
August 2021
Appendix C2_2_DMR Pre-Application_Meeting minutes
95 KB
August 2021
Appendix C2_3 DMR_Pre-Application Meeting presentation
1232 KB
August 2021
Appendix C3_1 WULA pre-application attendance register 20190128
107 KB
August 2021
Appendix C3_2 WULA DWS meeting 28Jan19 minutes Final 20190318
297 KB
August 2021
Appendix C4_1 BID English
1540 KB
August 2021
Appendix C4_2 BID Sepedi
1826 KB
August 2021
Appendix C5_1 Stakeholder Letter English Final
649 KB
August 2021
Appendix C5_2 Stakeholder Letter Sepedi Final
850 KB
August 2021
Appendix C6_1 Advert Site Notice E
232 KB
August 2021
Appendix C6_2 Advert Site Notice S
348 KB
August 2021
Appendix C6_3 Proof of Advert Platinum Gazette 20190111 E
265 KB
August 2021
Appendix C6_4 Proof of Advert Sekhukhune Times 20190110 S
292 KB
August 2021
Appendix C7_1 Proof of Site Notices
270 KB
August 2021
Appendix C7_2 Public places map
254 KB
August 2021
Appendix C8 Written comments received
2380 KB
August 2021

Appendix D_Specialist Studies

Documents
File Size
Date
 
Appendix D1_1 Hydrogeological Report
4678 KB
August 2021
Appendix D1_2 Hydrogeological Report Appendix B - Lab Certificate
444 KB
August 2021
Appendix D1_3 Hydrogeological Report Appendix C - DerBrochen Geochem Assessment
1755 KB
August 2021
Appendix D1_4 Hydrogeological Report Appendix D - DerBrochen Monitoring Programme Review v2Apr2019
2997 KB
August 2021
Appendix D2 Surface Water Report Final 20190822
6586 KB
August 2021
Appendix D3 Air Quality Report
8707 KB
August 2021
Appendix D4 Soil and Land Capability Report
6779 KB
August 2021
Appendix D5_1 Biodiversity Section A Background Information 020819
4007 KB
August 2021
Appendix D5_2 Biodiversity Section B Floral Assessment 020819
5037 KB
August 2021
Appendix D5_3 Biodiversity Section C Faunal assessment 120819
4792 KB
August 2021
Appendix D5_4 Biodiversity Section A Freshwater Assessment Revised 120819
8149 KB
August 2021
Appendix D5_5 Biodiversity Section B Aquatic Assessment Revised 120819
3512 KB
August 2021
Appendix D6 Noise and Vibration Report
4931 KB
August 2021
Appendix D7 Traffic Report
5163 KB
August 2021
Appendix D8_1a Heritage Report Chapters1-5
2313 KB
August 2021
Appendix D8_1b Heritage Report Chapter 6 Part A
7323 KB
August 2021
Appendix D8_1c Heritage Report Chapter 6 Part B
5855 KB
August 2021
Appendix D8_1d Heritage Report Chapters7-11 Appendix A-B
670 KB
August 2021
Appendix D8_2 Heritage Report Appendix Report
2275 KB
August 2021
Appendix D9 Social Impact Assessment
3931 KB
August 2021
Appendix D10_S Closure and Rehabilitation
754 KB
August 2021

Appendix E_Windeed records

Documents
File Size
Date
 
Appendix E_1 Windeed Der Brochen 7 JT Portion 0
150 KB
August 2021
Appendix E 2_Windeed Mareesburg 8 JT Portion 1
147 KB
August 2021
Appendix E_3 Windeed Mareesburg 8 JT Portion 7
146 KB
August 2021
Appendix E_4 Helena 6 JT Portion 0
150 KB
August 2021
Appendix E_5 Helena 6 JT Portion 3
151 KB
August 2021