Application For An Environmental Authorisation For The Proposed Relocation Of The Bulk Chemical Storage Facility At Anglo American Platinum’s Rustenburg Base Metal Refiners (RMBR), North West Province

Short Project Title

Draft Scoping Report the proposed relocation of the bulk chemical storage facility at Anglo American Platinum’s Rustenburg Base Metal Refiners (RBMR)

Project Title

Application for an environmental authorisation for the proposed relocation of the bulk chemical storage facility at Anglo American Platinum’s Rustenburg Base Metal Refiners (RMBR), North West Province

SRK Project Reference Number

561608

SRK Project Manager

Ndomupei Masawi

Contact Person

Ndomupei Masawi
Vusi Masango

Contact Email

nmasawi@srk.co.za
vmasango@srk.co.za

Contact Number

012 361 9821

PROJECT SYNOPSIS

SRK Consulting (SA) (Pty) Ltd (SRK) has been appointed by Anglo American Platinum’s Rustenburg Base Metals Refiners (RBMR) as the independent Environmental Assessment Practitioner (EAP) to conduct the Environmental Authorisation (EA) application process for the proposed relocation of the bulk chemical storage facility.

The reports and documentation for the EA application process will be compiled and finalised for submission to the North West Department of Economic Development, Environment, Conservation (DEDECT) for consideration and decision making. The DEDECT will consult with other government authorities as required in terms of Section 24(K) of the NEMA


PROJECT LOCATION

Bojanala Platinum District Municipality, Rustenburg Local Municipality, North West Province


STATUS OF PROJECT

Stakeholders are invited to register as Interested and Affected Parties (I&APs) to be kept informed on the progress of the project and comment on the report. The Draft Scoping Report will be available for a 30-day commenting period from 19 October 2020 to 17 November 2020.

The Draft Scoping Report can be accessed as an electronic copy on SRK Consulting’s webpage via the ‘Public Documents’ link https://docs.srk.co.za/en/za-application-environmental-authorisation-proposed-relocation-bulk-chemical-storage-facility-anglo


Anglo Bulk Chem Plant Relocation Draft EMPR

Reports

Documents
File Size
Date
 
561608_ Anglo Bulk Chem Plant Relocation Draft EMPR
2874 KB
August 2021

Appendices

Documents
File Size
Date
 
Appendix A - MSDS for Chemicals at the Current Tanks
1998 KB
August 2021

RBMR Bulk Chemical Storage Facility Relocation_Draft EIR

Reports

Documents
File Size
Date
 
561608_RBMR Bulk Chemical Storage Facility Relocation_Draft EIR
4352 KB
August 2021

Appendices

Documents
File Size
Date
 
Appendix A Curriculum Vitae of the Project Team
1407 KB
August 2021
Appendix B Project Experience
126 KB
August 2021
Appendix C DEDECT Scoping Report and PoS
302 KB
August 2021
Appendix D Project Locality Map
2470 KB
August 2021
Appendix E MSDS for Chemicals at the Current Tanks
1998 KB
August 2021
Appendix F Project Layout Plan
2648 KB
August 2021
Appendix G1 Specialist Studies Monthly Dustfall Monitoring Report
2932 KB
August 2021
Appendix G2 Specialist Studies Annual Integrated Surface and Groundwater Quality Part 1
6711 KB
August 2021
Appendix G2 Specialist Studies Annual Integrated Surface and Groundwater Quality part 2
8999 KB
August 2021
Appendix G3 Specialist Studies Atmospheric Emissions Survey Report
1869 KB
August 2021
Appendix G4 Specialist Studies Wetland Ecological Assessment
8527 KB
August 2021
Appendix G5 Specialist Studies Heritage Resources Management
3765 KB
August 2021
Appendix G6 Specialist Studies Biodiversity Assessment
6036 KB
August 2021
Appendix G7 Specialist Studies Regional_Settings
8148 KB
August 2021
Appendix G8 Specialist Studies Infrastructure Layout
5399 KB
August 2021
Appendix G9 Specialist Studies Proposed_Infrastructure_Layout
5218 KB
August 2021
Appendix G10 Specialist Studies Stormwater Management Plan
6130 KB
August 2021
Appendix H 1 Pre-application Authority Consultation
1523 KB
August 2021
Appendix H 2 Stakeholder Database
93 KB
August 2021
Appendix H 3 Notification Letters
1155 KB
August 2021
Appendix H 4 Site Notices
271 KB
August 2021
Appendix H 5 Newspaper Advertisements
653 KB
August 2021
Appendix H 6 Comments and Responses Report
191 KB
August 2021
Appendix H 7 Stakeholder Communications
1300 KB
August 2021
Appendix H 9 Commenting Authority Correspondence
519 KB
August 2021
Appendix I Environmental Management Programme
4859 KB
August 2021