Africa: Garafiri Bauxite

Authors

Author 1

Author 2

Author 3

Author 4

Since 2009, SRK has completed multiple phases of work on the Garafiri project in Guinea. The first being the supervision and design of exploration drilling from 2009-2010. SRK implemented industry best practice logging and sampling protocols and quality control procedures and organised the final exploration database. Next, SRK completed two mineral resource estimates following JORC Code standards, completed a conceptual study for the project, designed a sampling program to characterise bauxite and reported on the results. Since 2013, SRK has reviewed a 3rd party feasibility study on the project and planned licence relinquishment drilling and is currently completing a multi-disciplinary technical study for submission to the ministry.