Author 1
Author 2
Author 3
Author 4
In late 2007, SRK was appointed by Eskom (South African Electricity Supply Commission) to investigate, characterise and prepare licensing documents for three sites for the potential establishment of new nuclear power stations. The project was completed mid 2015 with the submission of Site Safety Reports. SRK was directly responsible for geotechnics, geohydrology, hydrology, water supply, and ecology and also managed sub-consultants who were responsible for meterorology, coastal engineering and oceanography, demography, land use and radiological impacts.