This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
Author 1
Author 2
Author 3
Author 4
SRK undertook a multi-disciplinary design of an integrated hydroelectric power, mine waste rock and tailings storage facility. The design features a 190.5 m high asphalt core rockfill dam, two diversion dams, a 35.5 m high cofferdam, two diversion tunnels, and hydropower intake and conveyance system linked to a turbine facility, and a side-hill spillway. Designing for this unique setting presented challenges including the remote location, 8 m of rainfall per annum, high seismicity and steep terrain. SRK undertook complex 3D limnological modelling to characterise the behaviour of the waste rock and tailings planned for sub-aqueous disposal into the reservoir.