This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
Author 1
Author 2
Author 3
Author 4
Between 2006 and 2013, SRK supported studies for this large copper-gold open-pit operation in Papua New Guinea, through geological mapping, hydrogeological testing and rock mass characterisation. The studies include slope and underground design for a geotechnical domain model, cutback design, considering shifts in stability as the mine reaches the final depth and a depressurisation study. SRK completed an investigation of a 5-km drainage tunnel to divert water from the pit floor without expensive pumping, mine scheduling studies and detailed open pit: underground interaction studies using numerical modelling to develop a sub-level cave beneath the current pit.