SRK completed the underground mining engineering components of a Feasibility Study for Heron Resources’ Woodlawn Project. Woodlawn is a volcanogenic massive-sulphide (VMS) copper-zinc deposit comprising two significant resource-based assets, the Woodlawn Underground Project (WUP) and the Woodlawn Tailings Retreatment Project (WRP). SRK prepared mine designs, developed ventilation plans, outlined power demand and water requirements, produced personnel and mining equipment schedules and prepared a Mineral Reserves estimate.