This website uses cookies to enhance browsing experience. Read below to see what cookies we recommend using and choose which to allow.
By clicking Accept All, you'll allow use of all our cookies in terms of our Privacy Notice.
Essential Cookies
Analytics Cookies
Marketing Cookies
Essential Cookies
Analytics Cookies
Marketing Cookies
As the production targets for block caving mines increase, there has to be an increase in the productive capacity of the operation, without increasing cost of having more active extraction drives. The simulation analysis will show a clear limitation to the productive capacity of a system of mobile LHDs and will also show how easily a continuous extraction system can overcome this limitation. There are several possible alternatives for such a system but there are process constraints that severely limit the number of options. These include the need for continuous access to all active draw-points, the ability to manage variations in ore fragmentation, and the rapid relocation from one draw-point to another, are some of the most important. The system also has to be sufficiently flexible to cope with the kind of seismic damage that often occurs in active extraction drives. A continuous extraction system that produces over 100,000 tonnes per day requires extraction drives to produce close to 5-10,000 tonnes per day each. The capital equipment cost of such a system would be much higher than batch production equipment, but the simulation results show how the increase in productive capacity creates a more cost-effective production process, with lower labour costs and lower energy cost. The simulation results also show the impact of a high-production capacity system on the rate of development of new extraction drives. The results show that long-term future of larger, more productive Block Caving mines will rely on the development and implementation of flexible, continuous extraction systems.