Mine Ventilation Tradeoff Study: Considering the Switch to Battery Electric Vehicles (BEV)

The purpose of this study was to consider an alternative ventilation system design for a previously completed feasibility study in which an all-diesel fleet was planned to be used for the mine. For this study, the mine requested that only the haul trucks and load-haul-dump loaders (LHD) be considered for conversion from diesel to battery electric. All other equipment would be left as diesel as in the previous study. This paper presents the ventilation assumptions which were made to complete this analysis and a discussion of the results. The results of the study showed significant reductions in the ventilation system power and infrastructure requirements with battery electric haul trucks and loaders compared to their diesel equivalents, but these savings depend on the changes implemented and the level of risk willing to be taken for a switch to BEVs.

Click here to view the presentation slides
 

Presenter

Nathan Wineinger

Mine Ventilation Consultant | SRK Clovis

Nathan Wineinger has over 9 years of ventilation related experience in mine and tunnel ventilation projects. He has performed ventilation surveys and developed mine ventilation models since 2011, and has experience conducting fire modeling and hazard analyses for subsurface facilities. Nathan also has experience in calculating mine air heating requirements and heating equipment specifications, analyzing ventilation system design to determine improvements, optimization, and future planning recommendations.