MONDI MULTI FUEL BOILER EA AMENDMENT

Short Project Title

Amendment to Environmental Authorisation for the proposed replacement Multi Fuel Boiler at Mondi Richards Bay Mill

Project Title

MONDI MULTI FUEL BOILER EA AMENDMENT

SRK Project Reference Number

591800

Official Reference Number

DC28/0007/2020/AMEND/2023

SRK Project Manager

Kirsten King

Contact Person

Kirsten King
Romi Bellusci

Contact Email

rbellusci@srk.co.za
kking@srk.co.za

Contact Number

074 111 4239
083 609 7783

PROJECT SYNOPSIS

Mondi Richards Bay Mill is proposing the decommissioning of two existing power boilers at its Richards Bay Mill and the installation of a new Multi Fuel Boiler (MFB), which has the capacity to burn both coal and biomass and will replace the existing boilers which have reached end-of-life. This new technology will enable Mondi to increase use of cleaner fuels in the long term. The construction of the MFB is yet to commence and Mondi is now proposing changes to the MFB layout and design as well as changes to the biomass handling area. All activities remain within the current Mill industrial footprint (Lot 6724 Alton, Richards Bay).


PROJECT LOCATION

Richards Bay


STATUS OF PROJECT

Final Environmental Amendment report available for review