Amendment to Environmental Authorisation for the proposed replacement Multi Fuel Boiler at Mondi Richards Bay Mill
MONDI MULTI FUEL BOILER EA AMENDMENT
591800
DC28/0007/2020/AMEND/2023
Kirsten King
Kirsten King
Romi Bellusci
rbellusci@srk.co.za
kking@srk.co.za
074 111 4239
083 609 7783
Mondi Richards Bay Mill is proposing the decommissioning of two existing power boilers at its Richards Bay Mill and the installation of a new Multi Fuel Boiler (MFB), which has the capacity to burn both coal and biomass and will replace the existing boilers which have reached end-of-life. This new technology will enable Mondi to increase use of cleaner fuels in the long term. The construction of the MFB is yet to commence and Mondi is now proposing changes to the MFB layout and design as well as changes to the biomass handling area. All activities remain within the current Mill industrial footprint (Lot 6724 Alton, Richards Bay).
Richards Bay
Final Environmental Amendment report available for review