Environmental Audit Report for the SPP EA for the Astron Energy Refinery
Environmental Audit of the Sandvik Pastillation Plant Environmental Authorisation held by Astron Energy for the Astron Energy Refinery, Cape Town
611861
AN/25/4/Caltex
Kelly Armstrong
Kelly Armstrong
karmstrong@srk.co.za
021 659 3060
In 2002, (then) Caltex Oil (SA) (Pty) Ltd received a Record of Decision (RoD) (Ref: AN/24/4/Caltex) in terms of Section 21 of the Environmental Conservation Act 73 of 1989 (ECA) authorising construction of the Sandvik Pastillation Plant (SPP) and the processing of sulphur at the refinery. Following receipt of the 2008 Audit Report on compliance with the conditions of the RoD, Department of Environmental Affairs and Development Planning (DEA&DP) issued a letter including 19 additional conditions relating to the design and operation of the SPP.
Condition 6 of the RoD requires Astron to appoint an independent Environmental Assessment Practitioner (EAP) to undertake an Environmental Audit of the SPP annually or as such frequency identified in an Environmental Management System. DEA&DP confirmed in a letter dated 15 November 2012 (Ref No AN/25/4/Caltex) their agreement to Astron submitting Environmental Audit Reports for the SPP on a three-yearly basis.
Astron Energy Refinery, Milnerton, Cape Town
SRK Consulting (South Africa) (Pty) Ltd (SRK) was appointed to undertake the 2024 Environmental Audit of compliance against the conditions of the RoD as well as the letter issued by the DEA&DP following the 2008 Audit Report.
On 9 December 2024, the 2024 Environmental Audit Report was submitted to DEA&DP.
The Environmental Audit Report is available for information below.