200BDTPD (Bone Dry Tonnes per Day) Repulper and Recovered Fibre Plant at Sappi Enstra Mill

Short Project Title

Sappi Recovered Fibre Plant

Project Title

200BDTPD (Bone Dry Tonnes per Day) Repulper and Recovered Fibre Plant at Sappi Enstra Mill

SRK Project Reference Number

440990

Official Reference Number

GDARD REFERENCE NO.: GAUT 002/11-12/W0019

SRK Project Manager

Laetitia Coetser

Contact Email

iminnaar@srk.co.za

Contact Number

012 361 9821

Sappi Recovered Fibre Plant

PROJECT SYNOPSIS

Sappi intends to mothball their current pulp mill, which will make them totally reliant on bought-in pulp of various grades to ensure that sufficient pulp is supplied to the paper machines.
In order to meet the paper demands Sappi proposes to procure paper waste from local suppliers and to repulp it in order produce waste-grade recycled paper. This activity is required to keep the mill operational. By running waste based grades on the paper machines, the viability and profitability of the mill should improve significantly.
SRK Consulting was appointed by Sappi as the independent Environmental Assessment Practitioner to undertake the Waste License Application process, which is required in terms of the National Environmental Management Waste Act, Act 59 of 2008 (NEMWA).


PROJECT LOCATION

Springs, Gauteng


STATUS OF PROJECT

The Final Draft Basic Assessment Report is available for public comment until 6 September 2012.
The report may be downloaded from the links below and the complete Draft Basic Assessment Report document is available for viewing at:

 

Sappi Enstra Mill 

East Geduld Road, Springs

011 360 0000


Documents

Reports

Documents
File Size
Date
 
440990.2012.01.12.final_.sappi_ba
3867 KB
September 2021

Appendices

Documents
File Size
Date
 
440990.2012.02.07.Appendix E1.Site Notice.Final
37 KB
September 2021
440990.2012.04.25.Appendix E1.Site Notice.Final
49 KB
September 2021
440990.2012.02.07.Appendix E4.Sappi BID.Final
519 KB
September 2021
440990.2012.02.07.Appendix E4.Sappi BID.Final.updated
274 KB
September 2021
440990.2012.02.10.Appendix E4.Final.Letter.Sappi WLA Stakeholders
164 KB
September 2021
440990.2012.04.30.Appendix E4.Final.Letter.Sappi WLA Stakeholders
90 KB
September 2021
440990.2012.02.29.Appendix H.Final.Sappi Draft EMP
1036 KB
September 2021