Sunderland Ridge Organic Biogas Waste-To-Energy Project

Short Project Title

Sunderland Ridge Organic Biogas Waste-To-Energy Project

Project Title

Integrated Environmental Authorisation Process for the Proposed Sunderland Ridge Organic Biogas Waste-To-Energy Project in the City of Tshwane, Gauteng Province

SRK Project Reference Number

596240

Official Reference Number

GDARD reference no.: 002/23-24/I0015

SRK Project Manager

Tamaryn Hale

Contact Person

Lynette Herbst

Contact Email

LHerbst@srk.co.za

Contact Number

11 441 1118

PROJECT SYNOPSIS

Bio2Watt Energy Holdings (Pty) Ltd (BEH) proposes to install an organic waste-to-energy biogas plant at Sunderland Ridge in Centurion, City of Tshwane, Gauteng Province. The plant will process organic waste (from agriculture and the food industry) to produce biogas and digestate. The digestate will be sold for use as a soil enhancer/fertiliser and the biogas will be converted to electricity and fed into the national grid, and compressed and sold to an off taker.

To meet investor requirements, an Environmental and Social Impact Assessment process is currently being undertaken in fulfilment of South African legislation as well as the International Finance Corporation Performance Standards on Environmental and Social Sustainability.

BEH appointed SRK Consulting (South Africa) (Pty) Ltd (SRK) as the independent Environmental Assessment Practitioner for the project. An integrated application for Environmental Authorisation (EA) is being applied for in terms of Section 24L of NEMA from Gauteng Department of Agriculture, Rural Development and Environment (GDARDE).

•                In terms of the latest amendments to the 2014 Environmental Impact Assessment (EIA) Regulations (published 07 April 2017), in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998) (NEMA), an application for EA via a Scoping and Environmental Impact Reporting (S&EIR) process is required. The Competent Authority for this application is the GDARDE.

•                A Waste Management Licence (WML) is required in terms of the 2017 List of Waste Management Activities that have, or are likely to have, a detrimental effect on the environment, promulgated in terms of the National Environmental Management: Waste Act, 2008 (Act No. 59 of 2008), as amended. The application will take place through the S&EIR process. In terms of Section 24L NEMA, an integrated application for EA are being applied for an Integrated Application for Environmental Authorisation is being applied for.

•                A Water Use Licence Application (WULA) is being undertaken in terms of the National Water Act, 1998 (Act No. 36 of 1998) for submission and approval from the Department of Water and Sanitation. Section 21(a): abstraction of water from a borehole, 21 (c) and (i): Road, pipeline and powerline watercourse crossings, and 21 (g): Effluent dams containing digestate, clean and dirty stormwater detention ponds and septic tank and soakaway water uses are being applied for.

•                An Atmospheric Emissions Licence (AEL) is to be applied for in terms of Section 21 of the National Environmental Management: Air Quality Act, 2004 (Act No. 39 of 2004) from the City of Tshwane. A Category 10: Animal Matter Processing listed activity is triggered.


PROJECT LOCATION

The project is proposed to be located on Portion 122 of the Farm Mooiplatts 355-JR, in the suburb of Sunderland Ridge, town of Centurion, City of Tshwane Metropolitan Municipality and Gauteng Province. The footprint of the site will be ~5 ha. The affected properties are zoned as “Agriculture: Undetermined” in the Centurion Town Planning Scheme. 


STATUS OF PROJECT

An application has been made to the GDARD for the integrated S&EIR and WML. An application was also made to the DWS for the WULA required. An application for AEL will be made to the City of Tshwane.

Interested and affected parties can register to receive more information on the project by emailing

Interested and affected parties are invited to submit their comments on the Draft EIA Report by Monday, 8 July 2024 

jbell@srk.co.za / lherbst@srk.co.za, or phoning +27 11 441 1118 / +27 87 087 4863.


Draft EIA

Reports

Documents
File Size
Date
 
Sunderland Ridge Draft EIA Report (June 2024)
31946 KB
June 2024

Appendices

Documents
File Size
Date
 
Appendix A - EAP CV
283 KB
June 2024
Appendix B - DFFE Screening Report
1954 KB
June 2024
Appendix C - Stormwater Management Approach
2617 KB
June 2024
Appendix D01 - Air Quality Assessment
8807 KB
June 2024
Appendix D02 - Soil Compliance Statement
3625 KB
June 2024
Appendix D03 - Geotechnical Assessment
4091 KB
June 2024
Appendix D03b - Geotechnical Assessment
9786 KB
June 2024
Appendix D04a - Dolomite Stability Investigation
8965 KB
June 2024
Appendix D04b - Dolomite Stability Addendum
3224 KB
June 2024
Appendix D05 - Hydrogeological Assessment
6779 KB
June 2024
Appendix D06 - Surface Water Assessment
4824 KB
June 2024
Appendix D07 - Terrestrial Compliance Statement
5036 KB
June 2024
Appendix D08 - Wetland Assessment
5084 KB
June 2024
Appendix D09 - Social Impact Assessment
7108 KB
June 2024
Appendix D10 - Noise Impact Assessment
16164 KB
June 2024
Appendix D11 - Visual Impact Assessment
10714 KB
June 2024
Appendix D12 - Heritage Impact Assessment
5578 KB
June 2024
Appendix D13 - Paleontological Assessment
7778 KB
June 2024
Appendix D14 - QRA
8323 KB
June 2024
Appendix D15 - Traffic Assessment
4279 KB
June 2024
Appendix D16 - GHG Assessment
5084 KB
June 2024
Appendix E01 - GDARDE Pre-app Meeting Minutes
1028 KB
June 2024
Appendix E02 - Stakeholder database (for public)
139 KB
June 2024
Appendix E03 - GDARDE FSR comments
376 KB
June 2024
Appendix E04 - CRR (May 2024)
339 KB
June 2024
Appendix F - EMPr (June 2024)
2164 KB
June 2024
Appendix G - External Specialist Reviews
1858 KB
June 2024

Information Leaflet

Documents
File Size
Date
 
596240_EIA Phase_Leaflet_Final_20240706
1640 KB
June 2024

Final Scoping Report

Reports

Documents
File Size
Date
 
Final Scoping Report - November 2023
10069 KB
May 2024

Appendices

Documents
File Size
Date
 
Appendix A - EAP CV(May 2024)
283 KB
June 2024
Appendix B - DFFE Screening Report(May 2024)
1954 KB
June 2024
Appendix C1 - Public Engagement
149 KB
May 2024
Appendix C2 - GARDE Pre-app Meeitng
1028 KB
May 2024
Appendix C3 - I&AP Database for Public
70 KB
May 2024
Appendix C4 - Advertisement
9720 KB
May 2024
Appendix C5 - Site Notices
6613 KB
May 2024
Appendix C6 - Proof of DSR Notifications
3461 KB
May 2024
Appendix C7 - Comments received on DSR
542 KB
May 2024